Welcome to Henan Coacci Intelligent Technology Co., Ltd.!
Air Dome Building Hotline: +86-371-62497906 Mobile: +8613027520737
Keqi News Center
Industry News Is Here

Focus on Coacci Tech News

Focus on industry hotspots, here you can understand Coacci Tech more deeply and comprehensively

Company News Industry Insights Product Knowledge

Scientific Maintenance Guide for Air Membrane Halls: Stable Structure & Smooth Operation

Date: 2026-06-04 Author: 科琦气膜

Air Membrane Stadium is widely adopted across diversified scenarios thanks to eco-friendly and high-efficiency features, which rely on coordinated performance of sealed membrane and electromechanical systems. Standardized maintenance can extend its service life by 5~10 years as well as guarantee safe operation. This article sorts out practical maintenance guidelines covering daily inspection, core system servicing and membrane upkeep.

巩义明泰4.jpg

I. Daily Inspection: Random spot check daily + full weekly inspection

Focus on three core components and keep inspection logs for immediate troubleshooting once defects are spotted:

1. Membrane & air tightness: Check daily for surface tears, scratches or foreign debris, loose seams and anchor fasteners. Cracks under 5mm shall be sealed with emergency tape; damage over 10mm requires shutdown and professional repair. Monitor internal air pressure daily (normal range: 500-1500Pa); investigate air leakage or fan failure if fluctuation exceeds ±100Pa.

2. Access doors & auxiliary facilities: Inspect rubber sealing strips weekly (replacement every 3 months) and test emergency door operation & alarm devices; verify integrity of lighting and fire-fighting equipment monthly.

3. Surrounding environment: Clear waste within 5 meters around the building weekly and unclog drainage ditches to avoid foundation damage from object impact or rain immersion.

II. Core System Maintenance: Secure stable operation of the core power system

Electromechanical assembly serves as the heart of air membrane buildings; scheduled in-depth maintenance effectively cuts breakdown rates:

1. Air supply & filtration: Clean fan filters monthly (primary filter: replaced every 1~3 months; medium filter: replaced semi-annually), check abnormal noise and vibration; inspect air duct tightness quarterly and add dedicated bearing lubricant every six months.

2. Pressure control: Calibrate pressure sensors with standard instruments every 3 months and adjust if reading error exceeds 5%; test flexibility of pressure regulating valves to prevent frequent fan on-off cycling.

3. Backup power supply: Run standby generator under no-load for 30 mins monthly and inspect fuel reserve; conduct full-load test yearly to ensure startup within 10s upon blackout and maintain minimum baseline pressure above 300Pa.

巩义明泰3.jpg

III. Membrane Maintenance: Extend main structure service life

Membrane performance dominates overall service lifespan; focus on regular cleaning, aging inspection and accessory maintenance:

1. Surface cleaning: Wash every quarter with neutral detergent, soft brush or low-pressure water gun (≤0.3MPa); avoid acidic/alkaline chemicals and abrasive cleaners. Remove ponding promptly after rainfall; increase cleaning frequency in dusty or rainy regions.

2. Aging inspection: Check annually for yellowing, coating peeling or reduced flexibility. For membranes over 10 years old, arrange professional tensile strength & tightness testing; partial replacement is required once performance drops by over 20%.

3. Steel cables & anchors: Test cable tension every six months and adjust if sag exceeds 10% of designed value, apply anti-rust paint on corroded areas; fasten anchor bolts with torque wrench quarterly.

IV. Seasonal Maintenance: Targeted solutions against varying climatic conditions

1. Rainy Season (Apr~Sep in South China): Clear drainage system in advance and inspect joint sealant; locate and repair water seepage after downpours.

2. Winter (Nov~Feb next year in North China): Remove ice on fans and pipelines weekly with warm water below 60°C (open flame prohibited); implement thermal insulation for backup generator and activate emergency pressure relief ahead of gale above Grade 8.

3. Summer (Jun~Aug nationwide): Maintain good indoor ventilation to keep membrane surface temperature under 50°C; install sunshade net for non-shading membrane and inspect fan heat dissipation monthly.

V. Emergency & Professional Inspection to Mitigate Operational Risks

1. Sudden air leakage: Activate backup power immediately if internal pressure drops over 300Pa within 10 mins, search for membrane rupture or door air leakage, apply temporary patch before permanent repair; evacuate occupants and contact manufacturer if leakage source cannot be pinpointed.

2. Periodic professional inspection: Conduct annual comprehensive third-party inspection with filed reports; carry out biennial structural safety appraisal once service life exceeds 15 years to meet relevant specifications.

Prevention-focused maintenance is the core principle for air membrane venue management. Operators shall build complete maintenance archives and provide regular skill training for on-site staff. Strict implementation of above specifications helps cut running cost and sustain long-term safe & efficient operation of air membrane facilities.

Coacci Tech Building Inquiry Message Module

Coacci Tech Building Inquiry Message Module

Online MessageWant to know air dome building prices? Advantages? Construction cycle? After-sales? Please leave a message, we will reply to you as soon as possible

ISO & CE Certified Air Dome Manufacturer
Coacci Tech Building Project Manager

Customizing Scheme

Coacci Tech Building Customer
01Send Inquiry(Price, materials, timeline)
02Get Response(Within 10 minutes)
03Custom Solution(Tailored to your needs)
  • Name:
  • Phone:*
  • Msg:*
  • Mr. ZhaoI want to know the price of building a 6000 sqm air dome

  • Mr. LiWhere is your factory? I want to visit and build a coal shed air dome

  • Manager ZhouIs there an office in Anhui? Can I visit the site?

  • Ms. ZhangCan you build one 130m long and 80m wide?

  • Mr. ChengDo you have air dome cases in Heilongjiang? I want to visit

  • Mr. WuWhat are the advantages of air dome? We used steel structures before

  • Mr. LiuDoes building an air dome venue require approval?

    24-hour technical consultation for industrial air dome and sports air dome 24-Hour
    Technical Support
    Air dome building solution design for industrial and sports air dome projects Free
    Solution Design
    Satisfactory service for industrial air dome and sports air dome Quality Service
    365 Days/Year
    After-sales support for industrial air dome and sports air dome products Lifetime
    Maintenance Support
    Henan Coacci Intelligent Technology Co., Ltd. WhatsApp WhatsApp QR Code
    Henan Coacci Intelligent Technology Co., Ltd. WeChat WeChat QR Code
    Coacci Tech Service HotlineService Hotline
    Address: Xinwei Industrial Park, Weishi County, Kaifeng City, Henan Province, China
    ×
    Add Coacci Tech WhatsApp

    WhatsApp QR Code